St. Gaudens Seawall
We are proud to be undertaking the demolition of approximately 600 linear feet of aging bulkhead, paving the way for a stronger, more resilient shoreline structure. The reconstruction phase includes 355 linear feet of new concrete pile and panel bulkhead and 245 linear feet of cantilevered steel sheet pile seawall, both designed for maximum durability. The entire system is being capped with steel-reinforced, industry-standard concrete to ensure long-term performance. To further fortify the shoreline, we are supplying and installing 450 tons of limestone riprap boulders, along with performing miscellaneous bulkhead repairs to protect surrounding infrastructure. This project reflects our commitment to delivering high-quality coastal solutions built to withstand the elements and support future growth.