MARGINAL ROAD BRIDGE

Categories: /30 Jun 2011

Client
Palm Beach County Construction Management

Location
Royal Palm Beach, FL

Engineer of Record
Bridge Design Associates, Inc.

Date of Completion
06/30/2011

Contract Bond
$152,826.10

Along the west side of the existing two-lane bridge, SFI removed the existing rip rap structure and underground force main; and, installed new underground force main, revetment mats, precast concrete piles, helical anchors, and a cast-in-place concrete sidewalk extension with a barrier wall and FDOT chain link fence.