Over the last 20 years Shoreline Foundation has developed extensive construction expertise for a wide variety of heavy marine / civil construction and deep foundation projects throughout Florida, the Bahamas and the Caribbean. Shown below are projects which are representative of this effort.

SFI crew driving piles for a bridge fender system

  • Job:
    • FDOT Bridge over Intracoastal
      @ Hallandale Beach
  • Location:
    • Hallendale, Florida
  • Description:
    • -400+ piles
    • -Reinforced concrete
    • -Pile caps
    • -Dredging
    • -Underwater utilities

Maintenence dredging at the Port of Miami

  • Job:
    • Port of Miami Emergency Dredging
  • Location:
    • Miami, Florida
  • Description:
    • -Maintenace dredging
    • -4 hour on-site emergency mobilization
    • -Location / removal of sunken fender system
    • -Construction of dredged-materials drying/retainage areas
    • -Turbidity sampling

SFI crews working on the outside support system of a tunnel

View of MIA tunnel enterance

  • Job:
    • Miami International Airport Runway Tunnel
  • Location:
    • Miami, Florida
  • Description:
    • -Sheetpile
    • -Concrete tremie for dewatering
    • -60' augercast foundation pile
    • -18" reinforced concrete slab
    • -Concrete Piles
    • -10' reinforced concrete walls

Mass excavation technique allowied for precise construction

Completed marina is home to mega yachts from around the world

  • Job:
    • Atlantis Marina
  • Location:
    • Paradise Island Nassau, Bahamas
  • Description:
    • -Concrete Piles
    • -Wood Piles
    • -Electrical
    • -Promenade
    • -Design/Building Approach
    • -Preformed in dry conditions
    • -Designed to accomodate mega yachts during a storm event

Maintenence dredging at the Port of Miami

  • Job:
    • FDOT N.W. 57th Avenue Emergancy Repair
  • Location:
    • Miami, Florida
  • Description:
    • -Temporary emergency shoring
    • -Steel sheet pile seawall
    • -Electrical and Lighting
    • -Concrete barrier wall
    • -Storm drain relocation
    • -Backfilling
    • -Asphalt

Precise layout and construction of Deering Bay Marina

  • Job:
    • Deering Bay Marina
  • Location:
    • Miami, Florida
  • Description:
    • -Complete Marina Construction
    • -Dredging
    • -Land reclamation

Foundation reconstruction of hurricane ravaged structures

  • Job:
    • Hurricane Rehabilitation, Cap Jaluca Resort
  • Location:
    • Anguilla, B.W.I.
  • Description:
    • -Temporary shoring to support existing buildings
    • -Construct massive seawall
    • -Backfill
    • -Restoration

Restoration of Chula Vista Canal and adjoining Bulkhead - Before

Finished Restoration

  • Job:
    • Chula Vista Canal System Improvements, 4.5 miles
  • Location:
    • Ft. Lauderdale, Florida
  • Description:
    • -Removal of overgrown vegetation & trees
    • -Dredge entire canal system
    • -Concrete seawalls
    • -Bridge Repairs

  • Job:
    • Renderings, "One Shipyard Place"
  • Location:
    • Jacksonville, Florida
  • Description:
    • The renderings commisioned by Shoreline Foundation for the TriLegacy Group project "One shipyard Place" in Jacksonville, Florida is indacative of the creative approach SFI brings to marina design and construction. The original drawings are on display at the One Shipyard Place office in Jacksonville

View of Key West's newest marina as built by SFI

  • Job:
    • Sunset Harbor Marina
  • Location:
    • Key West, Florida
  • Description:
    • -300+ concrete and wood piles
    • -Concrete floating docks & piers
    • -Electrical
    • -Plumbing
    • -Fuel facility
    • -Upland service building
    • -Dredging

Ground breaking ceremony for bulkhead reconstruction

Backfill of newly installed sheetpile

Arial view of bulkhead reconstruction

  • Job:
    • City of Miami Bicentennial Park
  • Location:
    • Miami, Florida
  • Description:
    • -Demolition and replacement of 3,265 lineal feet of existing concrete bulkhead and replacment with epoxy coated steel sheet pile combo-wall
    • -Largest single sheet pile project in Florida (2004)

Port of Miami infrastructure development at the Gantry Crane Dock

  • Job:
    • City of Miami Bicentennial Park
  • Location:
    • Miami, Florida
  • Description:
    • -5,400 lineal foot electrified frade beam;
      super panzer belt
    • -50 ship-fender systems
    • -Excavation
    • -Heavy Foundation

Haulover Park Marina - Phase 1 - Breakwater construction

Completed breakwater design for pedestrian access

  • Job:
    • Haulover Marina Miami Dade County
  • Location:
    • Miami, Florida
  • Description:
    • -1,608 lineal foot lighted breakwater
    • -Construction of 45 additional boat slips
      with utilities
    • -Electrical and Lighting
    • -Plumbing
    • -Concrete Piles
    • -Maintenance dredging

    Limerock boulder groin prior to final filling and grading of sand

    • Job:
      • Boca Raton Inlet Palm County Country
    • Location:
      • Boca Raton, Florida
    • Description:
      • -Excavation and earth work
      • -Crushed rock crib-foundation
      • -3500 ton limerock boulder groin
      • -Heavy Foundations